Palm Beach Intl Airport Long Term Parking Structure No. 2

This project was a seven story, 1,421,000 square foot precast concrete parking structure. It included all related site improvements as well as the construction of both vehicular bridges to tie this garage into an adjacent parking structure as well as a pedestrian bridge which ties into the existing Airport Terminal. To facilitate use of the pedestrian bridge, two elevators as well as five stair towers were constructed. This project also includes related revisions to existing electrical, water and drainage systems as required.