James A. Cummings

Ft. Lauderdale-Hollywood Intl Airport Terminal 4 Gate Replacement

The project scope includes the repositioning/relocation of existing Concourse H gates, construction of a western expansion of Concourse H, a secure connector bridge from Terminal 3 to the new Terminal 4 swing gates and required modifications to Terminal 3 to accommodate the connection; a sterile corridor (bridge and vertical circulation core) from the western expansion to the existing Federal Inspections Services; and new office space for BCAD (including an Operations Communication Center and FLL Emergency Operations Center). The scope of work may include expansion of the Explosives Detection Systems (EDS) and Security Checkpoint; and a Covering for the Bag Make-Up Area.